Concrete, block and the region's heavy red-clay spoil are dense enough that the physics does the deciding for you. A container that looks nearly empty can already be too heavy to legally move, which is why heavy debris always goes in a small, dedicated box.

Why heavy debris goes in a 10 yard
Concrete runs to roughly two tons per cubic yard. A 10 yard container filled level with it is already at the legal road weight for the truck carrying it.
Customers regularly ask for a 20 or 30 for a driveway, patio or foundation tear-out and are surprised when we decline. A 30 yard filled with masonry could not legally be moved, so it would simply sit on the property until somebody removed material by hand.
For larger demolition we run multiple 10 yard containers or stage them across the job. It's more deliveries, and it's the only way it can be done.
Clean concrete is recyclable
Here's where separation pays off. Clean concrete, block and clean masonry can be routed to a crusher and turned into reusable base material rather than hauled to a C&D landfill.
That's cheaper and greener, but clean means clean: concrete and masonry only, with no timber, no protruding rebar tangled through it, no general rubbish. Keep it separate from the start and it routes as clean inert material.
On a demolition or hardscape job, a dedicated concrete box alongside your general container lowers your disposal cost - which matters here, where the general debris carries a C&D-landfill tipping cost.
Red clay and heavy spoil
Beyond concrete, the heavy material here is often the ground itself. Georgia Piedmont red clay is dense and holds water, so the spoil from a footing, foundation, retaining wall or grading job is far heavier per cubic yard than the construction debris from the same job.
That spoil belongs in its own dedicated container and never mixed into general debris - it will hit the truck's weight limit while the box looks half full. Wet clay is heavier still, so let it dry where the schedule allows and keep the container covered.
Retaining walls and cut-and-fill work are common on the rolling Gwinnett lots, and they always produce more heavy clay and stone than the finished job suggests. Plan for a dedicated heavy container from the start.
Getting a heavy job priced right
Stone, block, old footings and red-clay spoil weigh far more than the volume suggests, and the tonnage in even a modest slab or retaining wall is usually more than the owner expects.
If you're demolishing a driveway, patio, slab, foundation or retaining wall, tell us the square footage and rough thickness and we'll work out the number of containers rather than guessing - the answer is routinely more than one 10 yard.
As with every heavy load, the disposal is cleaner kept separate, and every load leaves tarped for the haul. We route clean concrete to a crusher rather than to a C&D landfill as mixed waste.
Where we provide this service
We deliver concrete & heavy debris disposal across Snellville and throughout Gwinnett County, plus the surrounding towns in Rockdale, Walton, Morgan, Jasper and DeKalb counties.
Book concrete & heavy debris disposal in Snellville
One call gets you a flat rate, an honest size recommendation and a delivery slot.
(770) 746-7062Concrete & Heavy Debris Disposal: common questions
Why can't I have a 30 yard for concrete?
Because it couldn't legally be transported once loaded. Concrete runs to roughly two tons per cubic yard, so a 10 yard filled level is already at the truck's legal road weight. A larger container would simply sit on your property.
Can I recycle old concrete?
Yes. Clean concrete, block and clean masonry can go to a crusher and be turned into base material rather than hauled to a C&D landfill - but the load must be clean, with no timber, tangled rebar or rubbish. Tell us and we'll set up a dedicated box.
Does red clay really need its own container?
For any real quantity, yes. Georgia red clay is dense and holds water, so mixed into general debris it hits the weight limit while the box looks half full. Keep it separate in its own 10 yard, and let it dry first if you can.
How much concrete fits in a 10 yard?
By volume a 10 yard holds plenty, but weight is the limit - filled level with concrete it's already at legal road weight. For a typical driveway or patio tear-out that usually means one or more 10 yards filled to a level load.